Project Description

VANCOUVER CONDO RENOVATION

vision and challenges:

  • dark confined kitchen damaged from water leak above
  • second floor loft space and pipes from bathroom above lowered the effective kitchen ceiling height to 7’

design solutions:

  • removed internal walls creating open floor plan
  • relocated sink in front of one window
  • integrated office into kitchen
  • drop-ceiling accommodates task lighting, art accent light from side by office
  • island widens creating comfortable eating are for two; expands work surface; storage space underneath
  • expanded space visually with light coloured cabinetry, countertop blended with matching walls
  • hardwood flooring existed in entry/living room; new hardwood interwoven for seamless finish

Project Details

Categories
Condos